Product Detail :
|
This project involves the establishment of two substations Work A includes the construction of a 2X20 MVA, 66/11 kV substation at Yarappanahalli, along with the installation of 66kV, 1000 sqmm single core underground cable over a distance of 9.865 kilometers and the construction of one terminal bay. Work B consists of setting up a 2X31.5 MVA, 66/11 kV substation at Konadasapura-2, including the installation of 1.805 kilometers of 66kV, 1000 sqmm single core underground cable and an additional 11.610 kilometers of the same cable in Bengaluru East Taluk, Bengaluru Urban District. The project is to be executed on a partial turnkey basis, covering the supply of all necessary materials and equipment, excluding 11 kV switchgears, as well as the erection, civil works, testing, and commissioning. UG Cable Station Supply, UG Cable Station Erection, UG Cable Station mandatory spares, UG Cable Cable Supply, UG Cable Cable Erection, UG Cable Station Civil, UG Cable Cable Civil
|
| Tender Detail : |
This project involves the establishment of two substations: Work A includes the construction of a 2X20 MVA, 66/11 kV substation at Yarappanahalli, along with the installation of 66kV, 1000 sqmm single core underground cable over a distance of 9.865 kilometers and the construction of one terminal bay. Work B consists of setting up a 2X31.5 MVA, 66/11 kV substation at Konadasapura-2, including the installation of 1.805 kilometers of 66kV, 1000 sqmm single core underground cable and an additional 11.610 kilometers of the same cable in Bengaluru East Taluk, Bengaluru Urban District. The project is to be executed on a partial turnkey basis, covering the supply of all necessary materials and equipment, excluding 11 kV switchgears, as well as the erection, civil works, testing, and commissioning. |