|
Product Detail :
|
The project involves the construction of full-height partitions using powder-coated aluminum sections, with particle board for the lower half and float glass for the upper half. It includes the installation of aluminum sliding doors, handles, a stainless steel sink with a drain board for unsterile areas, drywall with polyurethane paint for sterile rooms, and a shoe rack for a temporary Eye Bank facility located in Room No. 449 of the medical college building at JIPMER Academic Campus. The work encompasses both civil and electrical components. powder-coated aluminum sections, particle board, float glass, aluminum sliding doors, stainless steel sink, drywall, polyurethane paint, shoe rack
|
| Tender Detail : |
The project involves the construction of full-height partitions using powder-coated aluminum sections, with particle board for the lower half and float glass for the upper half. It includes the installation of aluminum sliding doors, handles, a stainless steel sink with a drain board for unsterile areas, drywall with polyurethane paint for sterile rooms, and a shoe rack for a temporary Eye Bank facility located in Room No. 449 of the medical college building at JIPMER Academic Campus. The work encompasses both civil and electrical components. |