|
Product Detail :
|
The project involves the establishment of a substation with two 150MVA transformers at 220/66kV and one 12.5MVA transformer at 66/11kV in Jagaluru (Gowripura). It includes the construction of associated 220kV transmission lines over a distance of 20.502 km and 66kV transmission lines over 34.789 km, along with the construction of two 220kV terminal bays and three 66kV terminal bays. The scope covers the supply of all necessary materials and equipment (excluding 11kV switchgear and 12.5MVA power transformer) and their erection, including civil works, testing, and commissioning. Station Supply, Line supply, Mandatory Spares, Station Erection, Line Erection, Station Civil, Line Civil
|
| Tender Detail : |
The project involves the establishment of a substation with two 150MVA transformers at 220/66kV and one 12.5MVA transformer at 66/11kV in Jagaluru (Gowripura). It includes the construction of associated 220kV transmission lines over a distance of 20.502 km and 66kV transmission lines over 34.789 km, along with the construction of two 220kV terminal bays and three 66kV terminal bays. The scope covers the supply of all necessary materials and equipment (excluding 11kV switchgear and 12.5MVA power transformer) and their erection, including civil works, testing, and commissioning. |