|
2
|
Sector
|
Railways Transport Services Tenders
|
Tender Value
|
N.A.
|
Location
|
Tamil Nadu Tenders
|
Ref.No
|
63677278
|
Closing Date
|
21 - Dec - 2023
|
79 Days to go
|
View Tender Details
|
|
Supply, Installation, Testing, Commissiong and Training of Electrical, Plumbing, Fire Protection, VAC Works & BMS system from Madhavaram Milk Colony Station (Excluding) CH – 76.000 to Grain Market Station (Excluding) CH – 16399.716 for 6 Nos Underground stations and 10 Nos Elevated stations, Bored tunnel, Cut & Cover tunnel, U Section, Elevated ramp, Elevated Viaduct in Corridor 5 of Chennai Metro Rail Project Phase II.
|
|
|
|
|
5
|
Sector
|
Banking and Mutual Funds and Leasings Tenders
|
Tender Value
|
N.A.
|
Location
|
Tamil Nadu Tenders
|
Ref.No
|
64937188
|
Closing Date
|
10 - Nov - 2023
|
38 Days to go
|
View Tender Details
|
|
Auction Sale of Property, All Piece and Parcel of House Building Situated in Registration District, Thiruvannamalai Joint-2 Sub Registration District, Taluk, Kiliyapattu Village, Kiliyapattu Panchayat Board, Thurinjapuram Panchayat Union, New S.no.34/4, Its Old S.no.37/1-1.69.0, New S.no.34/5, Its Old S.no.38-0.80.5, as Per New Sub-division R.s.no.34/163, Patta No.2312, Formed as “selva Vinayagar Nagar” Layout, Plot No.69 Measuring East West 40ft., North South 50ft., Total Extent of 2000 Sq.ft., Or 185.8sq.mt., of Vacant Plot, Including 5years Old 2000 Sq.ft., Ground Floor R.c.c House Building, and 5years Old 1500 Sq.ft., 1st Floor R.c.c House Building, Electrical Connection No.02-209-004-473, Panchayat Tax Assessment No.1015, Bearing Door No.69 and Bounded On; North of :21ft., Wide Road, West of :20ft., Wide Road, South of : Plot No.63, East of : Plot No.70 Hereinafter Referred as the “said Property.
|
|
|
6
|
Sector
|
Power Plant Tenders
|
Tender Value
|
N.A.
|
Location
|
Tamil Nadu Tenders
|
Ref.No
|
64444004
|
Closing Date
|
30 - Oct - 2023
|
27 Days to go
|
View Tender Details
|
|
Supply of Oil Filled Transformers 63mva, 230/6 3/6 3 Kv, 3 Phase Csat/ Rats (q3), Supply of Oil Filled Transformers 63mva, 24/6 3/6 3kv, 3 Phase Uats (q3), Supply of Neutral Grounding Resistor 6/? 3kv, 100 Ohm (q3), Supply of 420kv, 125mvar, 3 Phase Shunt Reactor (q3), Supply of Online Dissolved Gas (dga) Analyser of Csat, Rat, Uat Shunt Reactor (q3), Supply of Mandatory Spares of Csat Rat (q3), Supply of Mandatory Spares of Uat (q3), Supply of Mandatory Spares of Shunt Reactor (q3), Supply of Mandatory Spares of Neutral Grounding Resister (ngr) (q3), Maintenance Tools Tackles for Maintenance Servicing of Oil Filled Transformers Shunt Reactor (q3), Oem Supervision Charges of First Oil Filled Transformers Among Csat Or Rats(pieces= Mandays) (q3), Oem Supervision Charges of Balance Oil Filled Transformers(csat/rat) (pieces= Mandays) (q3), Oem Supervision Charges of First Shunt Reactor(pieces= Mandays) (q3), Oem Supervision Charges of Balance Shunt Reactor (pieces= Mandays) (q3), Oem Supervision Charges of First Unit Auxiliary Transformers (uat) (pieces= Mandays) (q3), Oem Supervision Charges of Balance Unit Auxiliary Transformers (uat) (pieces= Mandays) (q3) Qty : 382
|
|
|
7
|
Sector
|
Crude Oil / Natural Gas / Mineral Fuels Tenders
|
Tender Value
|
N.A.
|
Location
|
Tamil Nadu Tenders
|
Ref.No
|
64980839
|
Closing Date
|
30 - Oct - 2023
|
27 Days to go
|
View Tender Details
|
|
PEB Warehouse and Workshop Package for Cauvery Basin Refinery (cbr) Project of Cpcl #*. Architectural, Civil-Structural, Air-Conditioning and Electrical works for PEB Warehouse and Workshop Buildings of CBR Project. 2. The scope of work covers the design, detailed engineering, preparation of shop drawings and documents, obtaining EIL/Owner approval, procurement & supply of material, fabrication at Contractor's workshop, transportation to site, erection and assembly at site for Warehouse (PEB) and Work Shop (PEB). 3. Total PEB area is 17, 240 m 2 (Workshop – 6, 480 m 2 + Warehouse – 10, 760 m 2 ).
|
|
|
|
|
|